New Projects in Deployment

In September 2022, the Eletrobras Companies had 152 large-scale projects in progress, with an associated Annual Allowed Revenue of R$738.5 million. Following are some of the most important projects in progress:

 

  • 230 kV transmission line Paraíso/Açu II/Mossoró, Circuits 3 and 2, 209 km long (RN) – Eletrobras Chesf;

  • Substation Aquiraz 230/69 kV, with an increase of 150 MVA in the installed capacity (CE) – Eletrobras Chesf;

  • Substation São João do Piauí 230/69 kV, with an increase of 300 MVA in the installed capacity (PI) – Eletrobras Chesf;

  • Substation Messias 230/69 kV, with an increase of 600 MVA in the installed capacity (AL) – Eletrobras Chesf;

  • Substation Campina Grande 230/69 kV, with an increase of 100 MVA in the installed capacity (PB) – Eletrobras Chesf;

  • Substation Icó 230/69 kV, with an increase of 100 MVA in the installed capacity (CE) – Eletrobras Chesf;

  • Substation Milagres 230/69 kV, with an increase of 100 MVA in the installed capacity (CE) – Eletrobras Chesf;

  • Substation Morro do Chapéu 230/69 kV, with an increase of 150 MVA in the installed capacity (BA) – Eletrobras Chesf;

  • Substation Fortaleza 230/69 kV, with an increase of 100 MVA in the installed capacity (CE) – Eletrobras Chesf;

  • Substation Poções II 230/123 kV, with an increase of 100 MVA in the installed capacity (BA) – Eletrobras Chesf;

  • Substation Bongi 230/69 kV, with an increase of 500 MVA in the installed capacity (PE) – Eletrobras Chesf;

  • Substation Miranda II 230/69 kV, with an increase of 100 MVA in the installed capacity (MA) – Eletrobras Eletronorte;

  • Substation Marabá 230/69 kV, with an increase of 67 MVA in the installed capacity (PA) – Eletrobras Eletronorte;

  • Substation Marabá 500 kV, replacement of series compensation (PA) – Eletrobras Eletronorte;

  • Substation Imperatriz 500 kV, replacement of series compensation (MA) – Eletrobras Eletronorte;

  • Substation Presidente Dutra 500 kV, replacement of series compensation (MA) – Eletrobras Eletronorte;

  • Substation Colinas 500 kV, replacement of series compensation (TO) – Eletrobras Eletronorte;

  • 138 kV transmission line Angra/Angra (Large), Reconstruction of 28 km and Rehabilitation of 6 km (RJ) – Eletrobras Furnas;

  • Substation Zona Oeste 500/138 kV, with an increase of 900 MVA in the installed capacity (RJ) – Eletrobras Furnas;

  • Substation Poços de Caldas 500/345 kV, with an increase of 40 MVA in the installed capacity (MG) – Eletrobras Furnas;

  • Substation Itumbiara 500/345/230 kV, Replacement of Transformers (MG) – Eletrobras Furnas;

  • Substation Itaberá 765kV, Replacement of series compensation (SP) – Eletrobras Furnas;

  • Substation Ivaiporã 765kV, Replacement of series compensation (SP) – Eletrobras Furnas;

  • Substation Siderópolis 230/69 kV, with an increase of 124 MVA in the installed capacity (SC) – Eletrobras CGT Eletrosul;

  • Substation Blumenau 230/138 kV, with replacement of Transformers and Capacitors Bank (SC) – Eletrobras CGT Eletrosul;

  • Substation Curitiba 525/230 kV, with replacement of Transformers and Reactor (PR) – Eletrobras CGT Eletrosul;

  • Substation Gravataí 525/230 kV, with replacement of Transformers and Reactors (RS) – Eletrobras CGT Eletrosul;

  • 230 kV transmission line Nova Prata 2/Vila Maria/Passo Fundo, Rehabilitation of circuits 1 and 2, totaling 397 km (RS) – Eletrobras CGT Eletrosul.