Main transmission lines completed

The main transmission projects completed by our companies or through partnerships with Special Purpose Entities (SPEs) in 2021 were:

• 230 kV transmission line Foz do Chapecó/Pinhalzinho 2, circuit 2, 37.26 km long (SC) - Eletrobras CGT Eletrosul.

• 230 kV transmission line Foz do Chapecó/Pinhalzinho 2, circuit 1, 36.06 km long (SC), incorporation of SPE FOTE - Eletrobras CGT Eletrosul.

• 230 kV transmission line GPEXPAN/Pindaí, circuit 1, 3.4 km long (BA) – Eletrobras Chesf.

• 230 kV transmission line Maçambará/Santo Ângelo, circuit 1, 200.10 km long (RS), incorporation of SPE FOTE - Eletrobras CGT Eletrosul.

• 230 kV transmission line Mossoro II/Açu II, circuit 2, 71.3 km long (RN) – Eletrobras Chesf.

• 230 kV transmission line Pau Ferro/Santa Rita II, circuit 1, 84.84 km long (PE/PB) – Eletrobras Chesf.

• 230 kV transmission line São Luís II/São Luís III, circuit 2, 34.28 km long (MA) – Eletrobras Chesf.

• Sectioning of the 230 kV transmission line Areia/Ponta Grossa Norte, circuit 1, 4.43 km long (PR) - Eletrobras CGT Eletrosul.

• Sectioning of the 230 kV transmission line Banabuiú / Mossoró II, circuit 2, 8.8 km long (CE/RN) – Eletrobras Chesf.

• Sectioning of the 230 kV transmission line Funil/Itapebi, circuit 2, 47.9 km long (BA) – Eletrobras Chesf.

• Sectioning of the 230 kV transmission line Jardim/FAFEN, circuit 1, 0.4 km long (SE) – Eletrobras Chesf.

• Sectioning of the 230 kV transmission line Londrina ESU/Apucarana, circuit 1, 7.58 km long (PR) - Eletrobras CGT Eletrosul.

• Sectioning of the 230 kV transmission line Monte Claro/Garibaldi 1, circuit 1, 3.8 km long (RS) – Eletrobras CGT Eletrosul.

• Sectioning of the 230 kV transmission line Mossoró II/Açu II, circuit 1, 6.53 km long (RN) – Eletrobras Chesf.

• Sectioning of the 230 kV transmission line Mossoró II/Açu II, circuit 2, 11.01 km long (RN) – Eletrobras Chesf.

• Sectioning of the 230 kV transmission line Paulo Afonso III/Angelim, circuit 1, 41.23 km long (AL/PE) – Eletrobras Chesf.

• Sectioning of the 345 kV transmission line Adrianópolis/Jacarepaguá, circuit 2, 23.8 km long (RJ) – Eletrobras Furnas.

• Expansion of the Viana 2 Substation at SPE MGE Transmissão S.A: Implementation of reinforcements in transmission facilities under its responsibility, referring to the Relocation of a bank of line reactors - 136 MVAr (3+1x45.33) for the bus of SE Viana 2 and Installation of the 2nd bank of 500/345 kV autotransformers, works began in August 2019 and went into full commercial operation in the second quarter of 2021 – Eletrobras Furnas.